It's going to be chopped about a bit and the first stage was to remove the rear sub frame and fabricate new shock mounting points. Pictures of that to follow but below you can see just how much we have gotten rid of.
We have a saddle and headlight on the way along with another tank to have a look at. I'll bung a few pictures of them up when they arrive.
We need new stanchions for the forks, they are pitted to buggery and need replacing. I need to make a battery box and something to bung all the electrics in. I have to check the hubs too, they may need replacing.
We have already swapped the bars out, the set it had fitted are twisted and no use at all. The exhaust is probably the best bit on the bike and we'll be using most of it. We need the switch clusters for both sides, brake and clutch levers and the loom is falling to bits and will need some serious remedial work.
The clocks are not too bad and will be used once they have been painted up.
More as things develop
No comments:
Post a Comment